Pre Construction
Spray, shower of flood the water mixed solution @ 5 litres per sq. Meter (10.76
sq. Feet) onto:
* Foundation pits
* Foundation when reaches at DPC level
* Before construction of temporary (katcha) floor.
* Between constructed area and outer plot boundary before concrete
Post-Construction
Drill holes inside and outside the walls at every 2 ft. Distance. Inject or
pour solution at 2-3 litres per hole in order to create a barrier inside, around
the walls and ground surfaces. All holes should be plugged after treatment.
spray solution on wooden doors, windows and their frames.
|